Data Center & Crypto Load.

A gigawatt campus is won or lost on time-to-power — and the megawatts don't flow until the transformers, gensets, and cooling are set. That critical path is ours to keep on schedule.

DISCUSS A CAMPUS SCOPE

// The Corridor Is Where AI Gets Built

The biggest build-out in the country is in our backyard.

The largest AI-infrastructure build-out in the United States is happening in the corridor. The flagship gigawatt-scale campus outside Abilene, Texas has carried real AI workloads since late 2025 and is on a path to roughly 1.2 GW across eight buildings — a couple hours from our Midland yard — with more campuses rising across Texas and New Mexico.

These sites are being built like heavy industry. To skip the grid-interconnection queue, many are standing up their own on-site gas plants; most run closed-loop liquid cooling. Crypto and bitcoin-mining load follows the same logic one size down — sited on cheap, stranded, and curtailed power, built fast, and heavy on transformers and switchgear. Different tenants, same lift.

// Why the Lift Is the Build

Time-to-power is a lifting problem.

A data campus doesn't earn a dollar until it's energized, and it can't be energized until the heavy electrical and mechanical gear is landed: main power transformers, backup generator fleets, chillers, switchgear, and increasingly whole prefabricated e-houses and power skids dropped in as units. Every one of those is a crane pick, and every one of them sits on the critical path to first megawatt.


On a schedule measured in weeks-to-power, the crane isn't a trade you call when you're ready — it's the pace-setter for the whole campus. A rented machine stuck in a hot-market queue doesn't just cost a lift; it moves the energization date.

// What Time-to-Power Demands

Schedule certainty is the product.

On a campus build, the lift plan is judged on one thing — does it hold the energization date:

OWNED FLEET


No Rental Queue

Our iron is on our payroll, not waiting in a hot-market rental line — the crane shows when the schedule says.

MODULAR


Prefab & E-House Setting

Prefabricated electrical buildings, power skids, and modular halls set as complete units to compress the schedule.

CRITICAL LIFT


Transformer Engineering

Load case, rigging, and ground bearing engineered for the heaviest gear on the

site — the main power transformers.

ASME B30.5


Mobile & Crawler Cranes

The operating and qualification standard governing every machine and operator we mobilize to the campus.

// Lifts We Make on a Data Campus

Substation to server hall.

// 01


Main Power Transformers


GSU and substation transformers — the single heaviest pieces on the campus — set and positioned on the critical path.

// 02

Backup Generator Fleets


Diesel and gas genset farms staged and set at production pace — often dozens of units on one campus.

// 03

Chillers & Cooling


Chillers, cooling distribution

units, and closed-loop cooling gear placed for the liquid-cooled halls AI demands.

// 04

E-Houses & Power Skids


Diesel and flare-gas generation, behind-the-meter and microgrid. Turning stranded flare gas into dispatchable power at the wellhead.

// 05

Switchgear & UPS Blocks


Medium-voltage switchgear and UPS and battery blocks set and positioned through the electrical rooms.

// 06

On-Site Power Plant


Where the campus builds its own generation, the same crews that set the gear set the turbines that feed it.

// How We Set a Campus on Schedule

Sequenced to the energization date.


1

Lift & logistics plan

Every pick sequenced backward from the date power has to flow, with deliveries and crane moves choreographed against it.


2

Laydown & staging

Yard and staging laid out so gear arrives, stages, and sets without the campus logistics choking the crane.


3

Heavy gear setting

The critical picks — main transformers and the largest cooling and power modules — landed and positioned first.


4

Production-pace setting

Genset fleets, skids, and repeat modules set at a steady, repeatable cadence that keeps the whole build moving.


5

Documented handoff

Gear handed to electrical commissioning on-position and on-schedule, with the pick records the EPC expects.


// The Iron That Sets the Megawatts

Fast, owned, and already in the corridor.

Not in a rental queue.

Campus work rewards mobility and capacity in equal measure — heavy all-terrains that move quickly between transformer pads, genset rows, and cooling yards, with crawlers behind them for the structural steel and skids. Our Midland yard puts that fleet inside a short haul of the corridor's biggest build-outs.


And it's all owned. In the hottest construction market in a decade, the crane you don't have to wait for is the one that keeps your energization date. Same machines, same crews, campus after campus.

SEE THE FLEET

// The Numbers Behind the Work


1.2GW

Flagship corridor campus


1,000 US-TON

Top of the owned fleet


1

Yard beside the Texas build-out


100%

Owned & self-performed

// Tell Us About the Campus

Got a load, a site, and a power-on date?

Send the gear list, the site, and the energization target.

We'll sequence the lifts to your schedule and keep the critical path moving to first megawatt.